Friday, November 1, 2019

Nugegoda Flyover Bridge Closed Down For Renovation Work-Heavy Traffic Is Being Prevailed In The Area

Image result for nugegoda flyover bridgeThe Nugegoda Flyover Bridge which was opened in January 2009 had been temporarily closed down from today (02) for a renovation work according to the Police .

Due to the closure a heavy traffic is being prevailed in the area at present it has been reported .

The 261 meters long and 8.5 meters wide flyover bridge had constructed within three and half month period .

Police have advised Motorists to use an alternative routes when travelling .

No comments:

Remembering One of the world's, largest Train Accidents reported from Sri Lanka In 2004

Tsunami memories:What happened in Paraliya in 2004.