Saturday, October 21, 2017
Friday, October 20, 2017
Hatton-Colombo Road Has Been Blocked Due To A Sand Mount Collapse
Hatton-Colombo main road has been completely
blocked due to a collapsing of a sand mount into the road at Millagahamula in Ginigathhena area according to reports.
Due to this situation police have requested the motorists to use Lakshapana-Kalugala-Nortonbridge road as an alternative road to travel.
The removal of the sand mount fallen into the road has been currently underway.
blocked due to a collapsing of a sand mount into the road at Millagahamula in Ginigathhena area according to reports.
Due to this situation police have requested the motorists to use Lakshapana-Kalugala-Nortonbridge road as an alternative road to travel.
The removal of the sand mount fallen into the road has been currently underway.
MOVIE TRAILER OF 11TH SINHALA FILM"SANGAWUNU PILITHURA"(HIDDEN ANSWER) SCREENED IN 1951
Vehicle Movement From Welikada Junction To Parliament Road To Be Restricted From 21st To 23rd Of October
Due to the construction work of Welikada flyover
bridge the vehical movement will be restricted from 21st October to 23rd of October between Welikada junction to Parliament Road in Battaramulle.
Accordingly vehical movement will be restricted from the point which begins the flyover bridge and motorists are being advised to avoid the bridge area and use Buthgamuwa road to Battaramulle as an alternative routes.
The transport activities of the extra lane in the center of flyover bridge too will be restricted from 23rd of October until the construction work of the Bridge has been completed.
bridge the vehical movement will be restricted from 21st October to 23rd of October between Welikada junction to Parliament Road in Battaramulle.
Accordingly vehical movement will be restricted from the point which begins the flyover bridge and motorists are being advised to avoid the bridge area and use Buthgamuwa road to Battaramulle as an alternative routes.
The transport activities of the extra lane in the center of flyover bridge too will be restricted from 23rd of October until the construction work of the Bridge has been completed.
Arambepola Rathanasara Thero Who Was Arrested Today Has Been Remanded
Mount Lavinia Additiinal Magistrate had remanded
the Arambepola Rathanasara thero who had been arrested today (20)over an obstructive behavior shown in front of a house in Mount Lavinia where a group of Rohingya refugees was kept in, until 30th of October.
Rathanasara Thero who was arrested in a bus while returning colombo at Nittambuwa area is due to be produced before an identification parade on 30th.
At the time of the arrest Rathanasara Thero had two national Identity Cards in his possession in which one prepared by last July carrying a photograph taken when he was a civilian .
the Arambepola Rathanasara thero who had been arrested today (20)over an obstructive behavior shown in front of a house in Mount Lavinia where a group of Rohingya refugees was kept in, until 30th of October.
Rathanasara Thero who was arrested in a bus while returning colombo at Nittambuwa area is due to be produced before an identification parade on 30th.
At the time of the arrest Rathanasara Thero had two national Identity Cards in his possession in which one prepared by last July carrying a photograph taken when he was a civilian .
Subscribe to:
Comments (Atom)
-
The Commonwealth Business Forum has inaugurated today (12) by president Mahinda Rajapaksha at Cinnamon Grand Hotel in Colombo with the par...
-
The two gazette notifications on mega projects that building a new luxury hotel with a casino by Australian Business Tycoon James Packer ...
-
A Motor Bicycle Rider was critically Injured and Hospitalized due to another underworld type shooting incident occurred at Delgaha Junction...




